Create a multilevel work breakdown structure (WBS), final paper help

Save your time - order a paper!

Get your paper written from scratch within the tight deadline. Our service is a reliable solution to all your troubles. Place an order on any task and we will take care of it. You won’t have to worry about the quality and deadlines

Order Paper Now

This assignment consists of two (2) parts: a project schedule, and a written response.
You must submit both parts as separate files for the completion of this
assignment. Label each file name according to the part of the
assignment it is written for.

Part A: Project Schedule
(Submit as one [1] Microsoft Project file)

  1. Create
    a multilevel work breakdown structure (WBS) and detailed project
    schedule based upon the information from Appendix 13.2. (copy attached)

Part B: Written Response
(Submit as a Microsoft Word file)

Write a one to two (1-2) page response in which you:

  1. Summarize the project’s performance in terms of schedule and costs.
  2. Recommend corrective actions (at least two [2] total) to improve the project’s performance. 
  3. Give your opinion on what you foresee as the greatest risk to the project.
  4. Format your assignment according to the following formatting requirements:
    • Typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.
    • Include
      a cover page containing the title of the assignment, the student’s
      name, the professor’s name, the course title, and the date. The cover
      page is not included in the required page length.